CorrectDeck® Composite Decking & Railing Systems

 

Return Home

Sitemap

Company Store

Distributor Login

Worldwide · FAQs

Products Installation Care & Upkeep Photos & Ideas Professionals Company Info Contact Us
Search CorrectDeck.com
Request a Sample

Installation

· Decking Installation

· Railing Installation

· Spacing Calculator

· Sizes & Specifications

· Installation FAQs

Home > Products > RapidRail > Installation > Installing 4x4 Post - Traditional Mount

Installing 4x4 Post - Traditional Mount (Before Decking Installation)

 

Determine preferred location of the rail post. Remember, CorrectDeck RapidRail is designed for a maximum span of 8' on center.

1. Lower each 4 x 4 post 71/2" into the outer rim joist frame.

2. Through the joist and post, pre-drill two offset 1/2" diameter holes 1" from the left and right edge of the post, approximately 41/2" apart vertically and no closer than 21/2" from the bottom of the post.

   
 

3. Install post using 1/2" x 8" carriage bolts and washers (not included). Box frame around the post.

 
 
 
 
 

 

Correct Building Products • 8 Morin Street • Biddeford, ME 04005
Toll Free: 1-877-332-5877 | Local: 207-284-5600 | Fax: 207-284-1001

 

©2006 Correct Building Products · About Us · Privacy · Search CorrectDeck.com

This site is optimized to work with Microsoft Internet Explorer 5.0, Netscape 6.0 and Mozilla Firefox 1.0. Website Plugins